Groundwater Management Plan – Final
CA Reservoir Conditions
CA Snow Water Content
KRCD AgLine
Pine Flat Lake
Precipitation
Consolidated Irrigation District
Fresno Irrigation District
Kings River Conservation District
Kings River East GSA
US Army Corps Of Engineers – Pine Flat Dam
Government Compensation in California
Assessment/Watersurcharge Rates
Miscellaneous Fee Schedule
Canal Crossing
Concrete Pipe Collar
Construction Joint
Expanded Metal Cover
General Construction Notes
Handrail-1
Handrail-2
Inlet – Outlet Detail
Manhole-1
Manhole-2
Manhole-3
Manhole-4
Manhole Air Vent
Parallel Pipeline Spacing
Paving Detail
Pipeline Backfill
Pipeline Crossing
Reinforcement 1
Reinforcement 2
Reinforcement 3
T-Vent
Trash Rack
AID Guard Post-1
AID Farm TO 1
AID Farm TO 2
AID Farm TO 3
AID Farm TO 4
AID Farm TO 5
Non-pressurized Drain Discharge